WHY and HOW answers to PSU and industry interview questions — ONGC, Oil India, IOCL, HPCL, BPCL, GAIL, NRL, BCPL, BARC, DRDO, NPCIL — with animations, plant-only knowledge, a mock interview, videos and solved PDFs.
What is inside
- 150+ questions answered with WHY and HOW
- Animations: cavitation, PSVs, flooding, surge, flare
- PSU guide: ONGC, IOCL, NRL, BARC, NPCIL and more
- Mock interview and video → solved PDF
Topics
- Pumps, piping & fluid flow (27 questions)
- Heat exchangers, furnaces & steam (19 questions)
- Distillation & separations (12 questions)
- Thermodynamics & energy (10 questions)
- Reactors & catalysts (10 questions)
- Gauges, transmitters & meters (13 questions)
- Valves, piping & fittings (22 questions)
- Instrumentation & control (12 questions)
- Refinery & petrochemicals (21 questions)
- Oil & gas upstream (12 questions)
- Process safety & plant practice (26 questions)
- Utilities (18 questions)
- Materials, corrosion & equipment (18 questions)
- Nuclear & heavy water (12 questions)
- Fertilisers & gas chemicals (8 questions)
- Plant operations & shift life (13 questions)
- Purchase, budget & office work (9 questions)
- HR & personal (13 questions)
Preparation by organisation
- ONGC: Oil and Natural Gas Corporation
- Oil India: Oil India Limited
- IOCL: Indian Oil Corporation
- HPCL: Hindustan Petroleum Corporation
- BPCL: Bharat Petroleum Corporation
- GAIL: GAIL (India) Limited
- NRL: Numaligarh Refinery Limited
- BCPL: Brahmaputra Cracker and Polymer Limited
- MRPL: Mangalore Refinery and Petrochemicals
- CPCL: Chennai Petroleum Corporation
- EIL: Engineers India Limited
- BARC: Bhabha Atomic Research Centre
- NPCIL: Nuclear Power Corporation of India
- Heavy Water Board: Heavy Water Board (DAE)
- DRDO: Defence Research and Development Organisation
- ISRO: Indian Space Research Organisation
- NFL: National Fertilizers Limited
- RCF: Rashtriya Chemicals and Fertilizers
- BVFCL: Brahmaputra Valley Fertilizer Corporation
Plant vocabulary
- Permit to work
- Written authorisation for non-routine jobs: hot work, cold work, confined space, height, electrical.
- LOTO
- Lock-out tag-out: isolate and lock every energy source before work.
- Spade / blind
- Solid plate inserted between flanges for positive isolation; a spectacle blind swings between open and closed.
- Car-seal open (CSO)
- A valve sealed in the open position, e.g. block valves under PSVs; changing it needs authorisation.
- MOC
- Management of change: review before any change to process, equipment or procedure.
- PSSR
- Pre-start-up safety review: checklist before commissioning new or modified equipment.
- Turnaround
- Planned shutdown every few years for inspection, cleaning and catalyst change.
- Hot work
- Any job that can create a spark or flame: welding, grinding, cutting; needs 0 % LEL gas test.
- Confined space
- Enclosed space with limited entry and exit (vessel, tank, pit); needs O₂ and gas tests and an attendant.
- Gas test
- Checking O₂, %LEL, H₂S, CO before entry or hot work with a calibrated detector.
- Purging
- Displacing air or hydrocarbon with nitrogen or steam to avoid flammable mixtures.
- Steaming out
- Blowing steam through equipment to remove hydrocarbons before opening.
- Flushing
- Circulating water or oil through new lines to remove debris before start-up.
- Hydrotest
- Pressure test with water to ~1.3 × design pressure.
- Pre-commissioning
- Checks before introducing process fluids: flushing, drying, loop checks, leak tests.
- Commissioning
- First introduction of process fluids and bringing the unit to stable operation.
- Trip / interlock
- Automatic action of the safety system to a safe state on an abnormal condition.
- ESD
- Emergency shutdown system, independent of normal control.
- Bypass (interlock)
- Temporarily overriding a trip; only with an authorised, logged procedure.
- DCS
- Distributed control system: the control-room computers running PID loops and graphics.
- Field operator / panel operator
- Field operators work in the plant; panel operators run the DCS; shift-in-charge leads both.
- Log book / handover
- Written record of plant status passed between shifts — read it before taking charge.
- Slop
- Off-spec hydrocarbon collected and reprocessed.
- Flaring
- Burning relieved or excess gases at the flare stack.
- Line-up
- Arranging valves for a transfer or start-up; double-check against P&ID.
- Running hours
- Equipment operating time used for maintenance planning and changeover of standby pumps.
- Changeover
- Switching from running to standby equipment (pumps, filters) without disturbing the process.
- Near miss
- An event that could have caused harm; reporting near misses prevents accidents.
- Toolbox talk
- Short safety briefing at the job site before work starts.
- PPE
- Personal protective equipment: helmet, safety shoes, goggles, gloves, FR coverall, respirator.
- Mock drill
- Practice of emergency response (fire, gas leak) with sirens and muster.
- Assembly point
- Safe place to gather and be counted during an emergency.
Organisation names show where a topic is a likely focus because of what the organisation does; they are not claims that a particular question was asked. Recruitment routes change each year, so confirm in the official notification.
Frequently asked questions
What is the Chemical Engineering Interview Studio?
Know the WHY and the HOW. WHY and HOW answers to PSU and industry interview questions — ONGC, Oil India, IOCL, HPCL, BPCL, GAIL, NRL, BCPL, BARC, DRDO, NPCIL — with animations, plant-only knowledge, a mock interview, videos and solved PDFs.
What can I do in the Chemical Engineering Interview Studio?
150+ questions answered with WHY and HOW; Animations: cavitation, PSVs, flooding, surge, flare; PSU guide: ONGC, IOCL, NRL, BARC, NPCIL and more; Mock interview and video → solved PDF.
Is the Chemical Engineering Interview Studio free?
Yes. It is free and runs in your browser with no sign-up.