Short answer: Pre-commissioning prepares the plant without process fluids — flushing, blowing, hydrotests, drying, loop checks, motor solo runs, catalyst loading. Commissioning introduces process fluids and brings the unit to stable operation and performance tests.
Why
Debris, moisture and wrong connections must be removed before hydrocarbons and catalysts are introduced.
How
- Line flushing and steam blowing (target plates for turbine steam lines).
- Instrument loop checks from field to DCS.
- Run-in of pumps on water.
- Inertisation, then gradual introduction of feed; performance guarantee test run.
Likely focus at
IOCL, HPCL, BPCL, NRL, MRPL, CPCL, ONGC, Oil India, GAIL, BCPL, EIL, NFL, RCF, BVFCL, NPCIL, Heavy Water Board. Organisation names show where a topic is a likely focus because of what the organisation does; they are not claims that a particular question was asked. Recruitment routes change each year, so confirm in the official notification.
Frequently asked questions
What is pre-commissioning and commissioning of a unit?
Pre-commissioning prepares the plant without process fluids — flushing, blowing, hydrotests, drying, loop checks, motor solo runs, catalyst loading. Commissioning introduces process fluids and brings the unit to stable operation and performance tests. Why: Debris, moisture and wrong connections must be removed before hydrocarbons and catalysts are introduced.
Related questions
- What types of corrosion occur in process plants?
- What is cathodic protection?
- What is the difference between design pressure, operating pressure and MAWP? What is a hydrotest?
- What are NDT methods used in plants?
- Why are mechanical seals preferred over gland packing for pumps?
- What is pipe schedule and flange rating?