Short answer: A procedure to review and approve any change to process, equipment, chemicals, procedures or organisation before it is implemented.
Why
Small, unreviewed changes (a bypass, a new material, a different catalyst) have caused major accidents, e.g. Flixborough (1974) temporary pipe.
How
- Describe the change, hazards assessed (HAZOP-lite), approvals from disciplines.
- Update P&IDs, procedures and training.
- Pre-start-up safety review (PSSR) before commissioning.
Likely focus at
IOCL, HPCL, BPCL, NRL, MRPL, CPCL, ONGC, Oil India, GAIL, BCPL, EIL, NFL, RCF, BVFCL, BARC, NPCIL, Heavy Water Board, DRDO, ISRO. Organisation names show where a topic is a likely focus because of what the organisation does; they are not claims that a particular question was asked. Recruitment routes change each year, so confirm in the official notification.
Frequently asked questions
What is Management of Change (MOC)?
A procedure to review and approve any change to process, equipment, chemicals, procedures or organisation before it is implemented. Why: Small, unreviewed changes (a bypass, a new material, a different catalyst) have caused major accidents, e.g. Flixborough (1974) temporary pipe.
Related questions
- What is HAZOP? Explain guide words with an example.
- What is the difference between a safety valve, a relief valve and a rupture disc?
- What is a permit-to-work system? Name the types of permits.
- What is LOTO (lock-out tag-out)?
- What are LEL and UEL? What is flash point and auto-ignition temperature?
- Explain the fire triangle and classes of fire. Which extinguisher for which fire?