Short answer: Remedial operations on an existing well to restore or increase production: replacing tubing, removing sand or scale, isolating water zones, acidising, perforating new zones.
Why
Production declines from formation damage, sand, scale, water breakthrough or mechanical failure.
How
- Kill the well with brine, install BOP, pull completion.
- Acid stimulation dissolves damage (HCl for carbonates, mud acid for sandstones).
- Hydraulic fracturing creates high-permeability paths.
Likely focus at
ONGC, Oil India. Organisation names show where a topic is a likely focus because of what the organisation does; they are not claims that a particular question was asked. Recruitment routes change each year, so confirm in the official notification.
Frequently asked questions
What is a workover? Why is it done?
Remedial operations on an existing well to restore or increase production: replacing tubing, removing sand or scale, isolating water zones, acidising, perforating new zones. Why: Production declines from formation damage, sand, scale, water breakthrough or mechanical failure.
Related questions
- What is the role of drilling mud?
- What is the difference between primary, secondary and enhanced oil recovery?
- What happens at a Group Gathering Station (GGS) or production installation?
- Why is natural gas dehydrated? How?
- What is the difference between LNG, CNG and LPG?
- What are porosity and permeability?