Process Economics & Optimization

Cost it, judge it, optimise it.

Open the interactive studio →

Time value of money, capital and manufacturing cost estimation, depreciation, NPV and IRR, break-even, optimum design, linear programming and CPM/PERT.

What is inside

  • Interest, annuities and cost indices
  • Lang factor capital and depreciation
  • NPV, IRR, payback and break-even
  • Optimum pipe size, LP and CPM/PERT

Syllabus: ASTU HS241506 · CHE181822 (cost chapters) Process Engineering Economics & Optimization, semester 5 & 8, No single ASTU course: built from HS241506 and the Project-II cost-estimation chapter. Official syllabus PDF.

Time value of money

Topics: Simple and compound interest; nominal and effective rates; continuous compounding; present and future worth; annuities, sinking fund and capital recovery factors; capitalised cost.

Money now is worth more than money later. Future value F = P(1 + i)ⁿ; present value P = F/(1 + i)ⁿ. An annuity of A per year for n years has present value P = A[(1 + i)ⁿ − 1]/[i(1 + i)ⁿ]; its inverse, the capital recovery factor, turns a capital cost into an equal yearly charge. Effective rate for m compoundings per year: (1 + r/m)^m − 1; continuous: e^r − 1. Capitalised cost K = C_V + (C_R)/((1 + i)ⁿ − 1) funds a replacement forever.

  • Compare alternatives at the same time point (present worth) or as equal annual cost.
  • Higher interest rate favours lower first cost.
  • Sinking fund factor = i/[(1 + i)ⁿ − 1].
  • Capitalised cost compares equipment with different lives.

Key formulas

  • F = P(1 + i)ⁿ
  • P = A[(1 + i)ⁿ − 1]/[i(1 + i)ⁿ]
  • CRF = i(1 + i)ⁿ/[(1 + i)ⁿ − 1]
  • i_eff = (1 + r/m)^m − 1
  • K = C_V + C_R/[(1 + i)ⁿ − 1]

Practice questions

₹1000 at 10 % compound for 2 years becomes

  1. ₹1200
  2. ₹1210
  3. ₹1100
  4. ₹1331
Show the answer

Answer: B. ₹1210 1000 × 1.21.

The capital recovery factor converts

  1. annual cost to present
  2. present cost to equal annual cost
  3. future to present
  4. nominal to effective
Show the answer

Answer: B. present cost to equal annual cost A = P × CRF.

12 % nominal compounded monthly has an effective rate of

  1. 12 %
  2. 12.68 %
  3. 13 %
  4. 11.4 %
Show the answer

Answer: B. 12.68 % 1.01¹² − 1.

Capitalised cost is used to compare equipment with

  1. the same life
  2. different lives
  3. no cost
  4. no salvage
Show the answer

Answer: B. different lives Perpetual service.

Theory questions

Pump A costs ₹2 lakh and lasts 5 years; pump B costs ₹3.5 lakh and lasts 10 years. At 10 %, which has the lower equivalent annual cost? (4 marks)

Show the model answer

CRF(10 %, 5) = 0.2638 ⇒ A: ₹52 760/yr. CRF(10 %, 10) = 0.1627 ⇒ B: ₹56 950/yr. Pump A is cheaper per year (ignoring running costs).

Define nominal and effective interest and derive the continuous-compounding limit. (3 marks)

Show the model answer

Nominal r is quoted per year; with m periods the effective rate is (1 + r/m)^m − 1. As m → ∞, (1 + r/m)^m → e^r, so i_eff = e^r − 1.

Capital cost estimation

Topics: Fixed capital and working capital; types of estimates (order-of-magnitude to definitive); cost indices (CEPCI); six-tenths rule and capacity exponents; equipment purchase-cost correlations; Lang factors; percentage-of-delivered-equipment method; total capital investment.

Total capital investment = fixed capital (equipment, installation, piping, instruments, buildings, engineering, contingency) + working capital (≈ 10–20 % of fixed capital). Costs move with time by a cost index: C₂ = C₁(I₂/I₁), using the CEPCI. Costs scale with capacity: C₂ = C₁(Q₂/Q₁)^n with n ≈ 0.6 for whole plants (six-tenths rule). A quick fixed-capital estimate multiplies delivered equipment cost by the Lang factor: 3.1 (solids), 3.6 (solid–fluid), 4.7 (fluid processing) in Peters’ basis, or ≈ 5 including all on-site costs.

  • Estimate classes: order-of-magnitude (±30–50 %), study, preliminary, definitive, detailed (±5 %).
  • CEPCI: 1957–59 = 100; recent years ≈ 800.
  • Contingency 10–20 % of fixed capital.
  • Delivered cost ≈ purchase × 1.1.

Key formulas

  • C₂ = C₁ (I₂/I₁)
  • C₂ = C₁ (Q₂/Q₁)^n, n ≈ 0.6
  • FCI = f_L × Σ C_delivered
  • TCI = FCI + WC

Practice questions

The six-tenths rule relates cost to

  1. time
  2. capacity
  3. temperature
  4. labour
Show the answer

Answer: B. capacity C ∝ Q^0.6.

The Lang factor for a fluid-processing plant (Peters) is about

  1. 1.5
  2. 3.1
  3. 4.7
  4. 10
Show the answer

Answer: C. 4.7 Fluid plants.

Working capital is roughly

  1. 1 %
  2. 10–20 % of FCI
  3. 100 % of FCI
  4. zero
Show the answer

Answer: B. 10–20 % of FCI Stocks, receivables, cash.

Updating a 2010 cost to 2025 uses a

  1. Lang factor
  2. cost index
  3. CRF
  4. Reynolds number
Show the answer

Answer: B. cost index CEPCI ratio.

Theory questions

A 50 000 t/yr plant cost ₹200 crore when CEPCI was 550. Estimate a 100 000 t/yr plant when CEPCI is 800. (4 marks)

Show the model answer

Capacity: 200 × 2^0.6 = 303.1; time: × 800/550 = ₹440.9 crore.

Delivered equipment for a fluid plant costs ₹50 crore. Estimate FCI and TCI. (3 marks)

Show the model answer

FCI = 4.7 × 50 = ₹235 crore; WC = 15 % ⇒ ₹35 crore; TCI ≈ ₹270 crore.

Manufacturing cost and depreciation

Topics: Direct production costs (raw materials, utilities, labour, maintenance, supplies, royalties); fixed charges (depreciation, taxes, insurance); plant overheads; general expenses; total product cost; depreciation: straight-line, declining-balance, sum-of-years-digits; taxes.

Total product cost = manufacturing cost (direct production + fixed charges + overheads) + general expenses (administration, distribution and selling, R&D). Raw materials often dominate (50–80 % for commodity chemicals). Depreciation is a non-cash cost that reduces tax: straight-line d = (V − V_s)/n; declining balance writes off a fixed fraction of book value each year; sum-of-years-digits gives larger early write-offs. Cash flow after tax = (revenue − cost excluding depreciation)(1 − t) + t × depreciation.

  • Maintenance ≈ 2–10 % of FCI per year.
  • Operating labour from operators per shift × shifts.
  • Depreciation is not cash; it shields tax.
  • Gross profit − tax = net profit.

Key formulas

  • d_SL = (V − V_s)/n
  • Declining balance: d_k = f × book value_(k−1)
  • SYD: d_k = (n − k + 1)/[n(n + 1)/2] × (V − V_s)
  • Cash flow = (S − C)(1 − t) + t d

Practice questions

Depreciation is

  1. a cash expense
  2. a non-cash expense
  3. income
  4. tax
Show the answer

Answer: B. a non-cash expense Book-keeping allocation.

Straight-line depreciation for ₹10 lakh, salvage ₹1 lakh, 9 years is

  1. ₹1 lakh/yr
  2. ₹1.11 lakh/yr
  3. ₹0.9 lakh/yr
  4. ₹10 lakh
Show the answer

Answer: A. ₹1 lakh/yr 9/9.

The largest cost item for commodity chemicals is usually

  1. labour
  2. raw materials
  3. royalties
  4. R&D
Show the answer

Answer: B. raw materials 50–80 %.

Sum-of-years-digits gives

  1. equal yearly write-off
  2. larger early write-off
  3. larger late write-off
  4. no write-off
Show the answer

Answer: B. larger early write-off Accelerated.

Theory questions

A plant has sales ₹100 crore, cash costs ₹70 crore, depreciation ₹10 crore and tax 30 %. Find net profit and cash flow. (3 marks)

Show the model answer

Taxable = 100 − 70 − 10 = 20; tax 6; net profit 14. Cash flow = 14 + 10 = ₹24 crore (= 30 × 0.7 + 0.3 × 10).

List the components of total product cost. (4 marks)

Show the model answer

Manufacturing cost: direct production (raw materials, utilities, operating labour, supervision, maintenance, supplies, lab charges, royalties), fixed charges (depreciation, local taxes, insurance, rent), plant overheads. General expenses: administration, distribution and selling, R&D.

Profitability analysis

Topics: Payback period; return on investment; net present value; discounted cash flow rate of return (IRR); profitability index; comparison of alternatives; incremental analysis; sensitivity.

Payback = fixed capital/annual cash flow (ignores time value). ROI = annual net profit/total investment. NPV = Σ CF_k/(1 + i)^k − investment; a project is acceptable when NPV > 0 at the company’s minimum acceptable rate. IRR (DCFRR) is the rate that makes NPV = 0, found by trial or bisection. Between alternatives, incremental analysis checks whether extra investment earns at least the minimum rate. Sensitivity plots show which price or cost moves NPV most.

  • NPV > 0 ⇒ accept.
  • IRR > hurdle rate ⇒ accept.
  • Payback ignores cash after payback and time value.
  • Mutually exclusive projects: choose on NPV or incremental IRR, not IRR alone.

Key formulas

  • Payback = FCI/annual cash flow
  • ROI = net profit/TCI
  • NPV = Σ CF_k/(1 + i)^k − I₀
  • IRR: Σ CF_k/(1 + r)^k = I₀

Practice questions

A project is acceptable if NPV is

  1. negative
  2. positive
  3. zero only
  4. undefined
Show the answer

Answer: B. positive Earns more than the discount rate.

IRR is the discount rate at which

  1. NPV is maximum
  2. NPV = 0
  3. payback = 1
  4. ROI = 0
Show the answer

Answer: B. NPV = 0 Definition.

Payback period ignores

  1. investment
  2. time value of money
  3. cash flow
  4. profit
Show the answer

Answer: B. time value of money Undiscounted.

Incremental analysis compares

  1. two projects’ extra investment and extra return
  2. only costs
  3. only sales
  4. taxes
Show the answer

Answer: A. two projects’ extra investment and extra return Is the extra worth it?

Theory questions

An investment of ₹100 lakh returns ₹30 lakh/year for 5 years. Find payback, NPV at 10 % and IRR. (5 marks)

Show the model answer

Payback = 3.33 years. PV factor (10 %, 5) = 3.791 ⇒ NPV = 113.7 − 100 = ₹13.7 lakh. IRR: factor = 3.333 ⇒ r ≈ 15.2 %.

Compare payback, ROI, NPV and IRR as profitability measures. (4 marks)

Show the model answer

Payback and ROI are simple but ignore time value; NPV gives absolute value created at a chosen rate; IRR gives a rate independent of the hurdle but can mislead between mutually exclusive projects or with sign-changing cash flows.

Break-even analysis and inventory

Topics: Fixed and variable costs; break-even point and margin of safety; cost–volume–profit; shutdown point; economic order quantity; ABC analysis.

With fixed cost F, variable cost v per unit and price p, profit is zero at the break-even quantity Q_BE = F/(p − v); (p − v) is the contribution per unit. Margin of safety = (actual − break-even)/actual. A plant should keep running in the short term as long as price covers variable cost (shutdown point). Inventory: the economic order quantity EOQ = √(2DS/H) balances ordering cost S per order against holding cost H per unit per year for annual demand D.

  • Contribution margin = p − v.
  • Raising price or cutting variable cost lowers break-even.
  • ABC analysis: A items (≈ 10 % of items, 70 % of value) get tight control.
  • Total inventory cost is flat near the EOQ.

Key formulas

  • Q_BE = F/(p − v)
  • Margin of safety = (Q − Q_BE)/Q
  • EOQ = √(2DS/H)
  • Total cost = DS/Q + HQ/2

Practice questions

Break-even quantity with F = ₹10 lakh, p = ₹100, v = ₹60 is

  1. 10 000
  2. 25 000
  3. 16 667
  4. 100 000
Show the answer

Answer: B. 25 000 10⁶/40.

EOQ increases when holding cost

  1. increases
  2. decreases
  3. is unchanged
  4. doubles demand
Show the answer

Answer: B. decreases EOQ ∝ 1/√H.

In the short run a plant should shut down if price is below

  1. total cost
  2. variable cost
  3. fixed cost
  4. zero
Show the answer

Answer: B. variable cost Shutdown point.

A items in ABC analysis are

  1. many, low value
  2. few, high value
  3. all equal
  4. obsolete
Show the answer

Answer: B. few, high value Pareto.

Theory questions

Annual demand 12 000 drums, order cost ₹500, holding ₹20 per drum per year. Find EOQ and orders per year. (3 marks)

Show the model answer

EOQ = √(2 × 12 000 × 500/20) = √600 000 = 775 drums; about 15.5 orders per year.

Draw and explain a break-even chart. (4 marks)

Show the model answer

Fixed-cost line horizontal; total-cost line from F with slope v; revenue line from origin with slope p. They cross at Q_BE; to the right is profit, to the left loss; the gap between actual output and Q_BE is the margin of safety.

Optimum design

Topics: Optimisation in design; objective functions; single-variable optimisation; optimum pipe diameter, optimum insulation thickness, optimum reflux ratio, optimum cooling-water flow; optimum production rate; multivariable problems.

Many design choices trade capital against operating cost: a thicker pipe costs more but needs less pumping power; thicker insulation costs more but saves heat; more reflux means fewer trays but larger reboiler and condenser duties. Write the total annual cost C(x) = capital charge(x) + operating cost(x), set dC/dx = 0 and check d²C/dx² > 0. Rules of thumb follow, e.g. optimum steel-pipe diameter D_opt ≈ 0.363 Q^0.45 ρ^0.13 (SI, turbulent; Peters) and optimum reflux ≈ 1.1–1.5 R_min.

  • Total annual cost has a minimum where marginal capital = marginal saving.
  • Annualise capital with CRF or a fixed charge factor.
  • Optimum is often flat: small errors cost little.
  • Check constraints (velocity limits, pressure drop).

Key formulas

  • dC/dx = 0, d²C/dx² > 0
  • D_opt ≈ 0.363 Q^0.45 ρ^0.13 (m, m³/s, kg/m³)
  • Insulation: C = a·x + b/(x + c) ⇒ x_opt = √(b/a) − c

Practice questions

The optimum pipe diameter minimises

  1. pressure drop only
  2. pipe cost only
  3. sum of annual pipe and pumping costs
  4. velocity
Show the answer

Answer: C. sum of annual pipe and pumping costs Total annual cost.

At the optimum of a minimum-cost problem

  1. dC/dx < 0
  2. dC/dx = 0 and d²C/dx² > 0
  3. dC/dx > 0
  4. C = 0
Show the answer

Answer: B. dC/dx = 0 and d²C/dx² > 0 Stationary minimum.

Optimum reflux ratio is typically

  1. R_min
  2. 1.1–1.5 R_min
  3. 10 R_min
  4. total reflux
Show the answer

Answer: B. 1.1–1.5 R_min Rule of thumb.

Increasing insulation thickness

  1. raises heat loss
  2. raises capital, lowers heat loss
  3. lowers capital
  4. has no effect
Show the answer

Answer: B. raises capital, lowers heat loss Trade-off.

Theory questions

Find the optimum diameter for 0.05 m³/s of water (ρ = 1000). (3 marks)

Show the model answer

D = 0.363 × 0.05^0.45 × 1000^0.13 = 0.363 × 0.2596 × 2.454 = 0.231 m: choose an 8 or 10 inch schedule-40 pipe (velocity ≈ 1.2 m/s).

Annual cost of insulation is C = 20 000x + 300/(x + 0.02) (₹ per m of pipe, x in m). Find x_opt. (4 marks)

Show the model answer

dC/dx = 20 000 − 300/(x + 0.02)² = 0 ⇒ (x + 0.02)² = 0.015 ⇒ x + 0.02 = 0.1225 ⇒ x ≈ 0.10 m (100 mm). Check d²C/dx² = 600/(x + 0.02)³ > 0, so it is a minimum.

Optimisation methods

Topics: Unconstrained optimisation: analytical, search methods (golden section, Newton); constrained optimisation: Lagrange multipliers; linear programming: formulation, graphical and simplex methods; applications: product mix, blending, refinery planning.

Single-variable searches (golden section, Fibonacci) shrink an interval around a minimum without derivatives; Newton’s method uses f′ and f″. With equality constraints, Lagrange multipliers solve ∇f = λ∇g. Linear programming maximises a linear objective subject to linear constraints; the optimum lies at a corner of the feasible region (graphical method for two variables, simplex for many). Refinery blending and product-mix problems are classic LPs.

  • Golden section reduces the interval by 0.618 each step.
  • LP optimum is at a vertex of the feasible region.
  • Shadow price: gain per extra unit of a scarce resource.
  • Non-linear problems may have several local optima.

Key formulas

  • Golden ratio τ = 0.618
  • Newton: x_(k+1) = x_k − f′(x_k)/f″(x_k)
  • Lagrange: ∇f = λ∇g
  • LP: max cᵀx, Ax ≤ b, x ≥ 0

Practice questions

The LP optimum lies at

  1. the centre
  2. a vertex of the feasible region
  3. outside
  4. the origin always
Show the answer

Answer: B. a vertex of the feasible region Corner-point theorem.

Golden-section search reduces the interval each step by a factor of

  1. 0.5
  2. 0.618
  3. 0.382
  4. 0.9
Show the answer

Answer: B. 0.618 τ.

Lagrange multipliers handle

  1. equality constraints
  2. integer variables only
  3. no constraints
  4. discontinuities
Show the answer

Answer: A. equality constraints ∇f = λ∇g.

A shadow price tells

  1. the cost of a product
  2. the value of one more unit of a constrained resource
  3. tax
  4. depreciation
Show the answer

Answer: B. the value of one more unit of a constrained resource Dual value.

Theory questions

A plant makes A (₹40/kg profit) and B (₹30/kg). Steam: 2A + B ≤ 100; labour: A + 2B ≤ 80. Find the best mix. (4 marks)

Show the model answer

Corners: (0,0) 0; (50,0) 2000; (0,40) 1200; intersection 2A + B = 100, A + 2B = 80 ⇒ A = 40, B = 20 ⇒ 1600 + 600 = 2200. Best: 40 kg A and 20 kg B, profit ₹2200.

Explain the golden-section method. (3 marks)

Show the model answer

For a unimodal function on [a, b], evaluate at two interior points placed 0.382 and 0.618 of the way; discard the part beyond the worse point; one old point is reused each step; the interval shrinks by 0.618 per evaluation.

Project scheduling: CPM and PERT

Topics: Network diagrams; activities and events; critical path; float; PERT three-time estimates, expected time and variance; probability of completion; crashing and time–cost trade-off; Gantt charts.

A project network shows activities and their order. A forward pass gives earliest times, a backward pass latest times; activities with zero total float form the critical path, whose length is the project duration. PERT uses optimistic, most likely and pessimistic times: t_e = (a + 4m + b)/6, σ² = ((b − a)/6)². The completion probability uses Z = (T − T_e)/√Σσ² along the critical path. Crashing shortens critical activities at the least cost per day first.

  • Total float = LS − ES = LF − EF.
  • Critical path has zero float and the longest duration.
  • Crash the cheapest critical activity first; watch for new critical paths.
  • Gantt charts show schedule against time.

Key formulas

  • t_e = (a + 4m + b)/6
  • σ² = ((b − a)/6)²
  • Z = (T − T_e)/√(Σσ²)
  • Float = LS − ES

Practice questions

PERT expected time with a = 2, m = 5, b = 14 is

  1. 5
  2. 6
  3. 7
  4. 7.5
Show the answer

Answer: B. 6 (2 + 20 + 14)/6.

Activities on the critical path have

  1. maximum float
  2. zero float
  3. negative cost
  4. no duration
Show the answer

Answer: B. zero float Any delay delays the project.

Crashing means

  1. cancelling
  2. shortening activities at extra cost
  3. adding float
  4. removing dummies
Show the answer

Answer: B. shortening activities at extra cost Time–cost trade-off.

PERT assumes activity times follow a

  1. normal
  2. beta
  3. uniform
  4. Poisson
Show the answer

Answer: B. beta Beta distribution.

Theory questions

Activities: A (3 d), B (4 d) after A, C (2 d) after A, D (5 d) after C, E (1 d) after B and D. Find the critical path and duration. (4 marks)

Show the model answer

Paths: A–B–E = 8 d; A–C–D–E = 11 d. Critical path A–C–D–E, 11 days; B has 3 days float.

A critical path has T_e = 40 days and σ² = 16. Find the probability of finishing within 44 days. (3 marks)

Show the model answer

σ = √16 = 4 days. Z = (44 − 40)/4 = 1, and from the normal table P(Z ≤ 1) ≈ 0.84, so there is about an 84 % chance.

Notes, examples and questions were written for this studio; the prescribed books are listed in the studio for reference.

Frequently asked questions

What is the Process Economics & Optimization Studio?

Cost it, judge it, optimise it. Time value of money, capital and manufacturing cost estimation, depreciation, NPV and IRR, break-even, optimum design, linear programming and CPM/PERT.

What can I do in the Process Economics & Optimization Studio?

Interest, annuities and cost indices; Lang factor capital and depreciation; NPV, IRR, payback and break-even; Optimum pipe size, LP and CPM/PERT.

Is the Process Economics & Optimization Studio free?

Yes. It is free and runs in your browser with no sign-up.